Our footprint

Securing an industry-leading project completion rate, serving diverse markets with complex energy needs.

Innovative energy solutions

7.5GW
6countries
100%project completion rate
Projects
Offices
121124Miami HQOfficeSantiagoOfficeSão PauloOfficeMexico CityOfficeBogotaOfficeMadridOffice

Our project portfolio

Country

All countries (20)
CHILE (4)
BRAZIL (11)
COLOMBIA (1)
MEXICO (2)
URUGUAY (2)

All countries (20)

María Elena, Región Antofagasta, Chile200 MW

Bess del Desierto

BESS del Desierto is a stand-alone battery energy storage system currently under construction.

Arinos, Minas Gerais579 MW

Draco

The Draco solar plant is currently under development and will service multiple clients.

Tolima201 MW

Shangri-La

Shangri-La is currently operating and holds a long-term PPA under Atlas Renewable Energy. The 201-MWp solar plant reached COD in November 2025, marking a major milestone for clean energy in Colombia.

Minas Gerais876 MW

Luiz Carlos

Luiz Carlos is currently operating and was developed under a BOT structure with ArcelorMittal. The 315-MWp centralized solar plant reached COD in 2025, marking the steelmaker’s first solar facility in Brazil. Following the start of operations, Atlas began the full transfer of asset ownership to ArcelorMittal Brazil under the terms of the agreement.

Minas Gerais902 MW

Vista Alegre

Vista Alegre is currently operating and holds a long-term PPA with Albras. The project reached COD in 2025.

Campeche300 MW

La Pimienta

La Pimienta is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2022.

Hidalgo129.5 MW

Guajiro

Guajiro is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2019.

Minas Gerais438 MW

Boa Sorte

Boa Sorte is currently operating and holds a 20-year PPA with ALBRAS. The project reached COD in 2024.

Minas Gerais239 MW

Lar Do Sol

Atlas Renewable Energy developed, built, and operated Lar do Sol from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Minas Gerais358 MW

Casablanca

Casablanca is currently operating and holds a 15-year PPA with Anglo American. The project reach COD in 2022.

Bahia187 MW

Jacaranda

Jacaranda is currently operating and holds a 15-year PPA with Dow Inc. The project reached COD in 2021.

Barreiras117 MW

Sertão Solar

Atlas Renewable Energy developed, built, and operated Sertão Solar from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Ceará81 MW

Sol Do Futuro

Atlas Renewable Energy developed, built, and operated Sol do Futuro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Bahia67.1 MW

São Pedro

Atlas Renewable Energy developed, built, and operated São Pedro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Bahia156 MW

Eng. Manoel De Andrade

Atlas Renewable Energy developed, built, and operated Eng. Manoel de Andrade from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

El Salto17 MW

Del Litoral

Del Litoral is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.

El Salto58 MW

El Naranjal

El Naranjal is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.

Antofagasta230 MW

Sol Del Desierto

Sol del Desierto is currently operating and holds a 15-year PPA with Engie Energia Chile. The project reached COD in 2022.

Colina127 MW

Quilapilun

Quilapilun is currently operating and holds a 15-year PPA. The project reached COD in 2017.

Chañaral69.5 MW

Javiera

Javiera is currently operating and holds a 20-year PPA with Minera Los Pelambres (Antofagasta Minerals). The project reached COD in 2015.